Page 113 - GRIHA Manual Volume I - Introduction to National Rating System
P. 113
100 Griha Manual: Volume 1



the contract (mutually signed between the respective parties) document or supportive
documents, verifi ed and signed by the responsible parties.
33.2.3 Applicant shall provide proof of inclusion of specifi c clause in the contract document of the
system supplier for commissioning (installation and test run) of all electrical and mechanical
systems.
33.2.4 Applicant shall provide proof of inclusion of a specifi c clause in the contract document of
the systems supplier for providing training to the core facility/ service group responsible for
the O&M of the building systems after installation, on the operating instructions/dos and
don’ts/ maintenance requirements for the specifi c system.
33.2.5 Submit a copy of the fully documented O&M manual/ CD/ Multimedia / information
brochure enlisting the best practices for O&M of the building’s systems. The name and
address of the manufacturer/supplier of the respective system, owner/builder to be given
to the occupants or to the service/facility management group at the time of occupation.

33.3 Appraisal (maximum points-2) mandatory
33.3.1 Provision of meters for monitoring building’s energy and water consumption, as per clause
33.2.1 (1 point mandatory).
33.3.2 Provision for a core facility/service group responsible for the O&M of the building’s
systems after installation as per clause 33.2.2. Inclusion of a specifi c clause in the contract
document of the systems supplier for commissioning (installation and test run) of all
electrical and mechanical systems as per clause 33.2.3. Inclusion of a specifi c clause in
the contract document of the systems supplier for providing training to the core facility/
service group responsible for the O&M of the building systems after installation, on the
operating instructions/dos and don’ts/ maintenance requirements for the specifi c system,
as per clause 33.2.4. Development of a fully documented O&M manual/ CD/ Multimedia /
information brochure enlisting the best practices for O&M of the building’s systems, as per
clause 33.2.5 (1 point mandatory).
   108   109   110   111   112   113   114   115   116   117   118