Predefi ned templates
Online calculator for Criterion 13
Step 6 Project details and project summary sheet
# The ‘Project Details’ is a page that gives an overall view of all the criteria and their current status.
The coordinator can monitor and track the progress of the project through this page and the
project summary sheet.
# The consultant can view in detail and update only those criteria that they have been assigned.
# They will then be able to upload the compliance documents to the GRIHA webportal.
# Once all the compliance documents for the attempted criteria are submitted, the summary sheet
is ready for onward submission to ADaRSH (GRIHA secretariat) for evaluation. All compliance
documents related to mandatory criteria need to be submitted in addition to the compliance
documents of the attempted optional criteria (the fi elds for the attempted optional criteria shall
be activated by the coordinator during project registration).
# Submission of the summary sheet can be done by the coordinator only after all compliance
documents related to all attempted criteria are fi lled. If the coordinator attempts to submit
the summary sheet without fully completing it, he/she shall receive an error message and the
erroneous areas shall be highlighted.
Predefi ned templates
Online calculator for Criterion 13
Step 6 Project details and project summary sheet
# The ‘Project Details’ is a page that gives an overall view of all the criteria and their current status.
The coordinator can monitor and track the progress of the project through this page and the
project summary sheet.
# The consultant can view in detail and update only those criteria that they have been assigned.
# They will then be able to upload the compliance documents to the GRIHA webportal.
# Once all the compliance documents for the attempted criteria are submitted, the summary sheet
is ready for onward submission to ADaRSH (GRIHA secretariat) for evaluation. All compliance
documents related to mandatory criteria need to be submitted in addition to the compliance
documents of the attempted optional criteria (the fi elds for the attempted optional criteria shall
be activated by the coordinator during project registration).
# Submission of the summary sheet can be done by the coordinator only after all compliance
documents related to all attempted criteria are fi lled. If the coordinator attempts to submit
the summary sheet without fully completing it, he/she shall receive an error message and the
erroneous areas shall be highlighted.