58 Griha Manual: Volume 1



1.2 Compliance
The following documents are to be submitted.
1.2.1 Document to prove conformity to the development plan/master plan/UDPFI guidelines.
1.2.2 Site plan (one AutoCAD [computer aided design] drawing) showing the site and its
surrounding areas (up to 2 km radius)
1.2.3 Site plan (one Auto CAD drawing) showing the site connectivity to public transport corridors
and details of the existing site and/or its feasibility to be converted for redevelopment if the
selected site is a brown fi eld site.


1.3 Appraisal (maximum points 1) partly mandatory

1.3.1 The site plan must be in conformity to the development plan/master plan/UDPFI guidelines
(mandatory). This should comply with the provisions of the eco-sensitive zone regulations,
coastal zone regulations, heritage areas (identifi ed in the master plan or issued separately
as guidelines), water body zones (in such zones, no construction is permitted in the water
spread and buff er belt of 30 m minimum around the FTL), various hazard prone area
regulations, and others if the site falls under any such area (mandatory with no point
allocation).
1.3.2 The site should be located within ½ km radius of an existing bus stop commuter rail, light
rail or metro station and/or select Brownfi eld site (to rehabilitate damaged sites where
development is hindered by environmental contamination, thereby reducing pressure on
undeveloped land. (1 point)