Page 54 - GRIHA Manual Volume IV - Introduction to National Rating System
P. 54
Building planning and construction 45
Guide to use GRIHA online evaluation tool
Select criterion 17 on the homepage of GRIHA. Check the goals that are to be attempted.
Once the goals are selected, the required compliance documents will be checked. Compliance
17.2.1 requires cut sheets, specifications sheets, and brochures of the materials/finishes used in the
building. Compliance 17.2.2 requires submission of AutoCAD drawings, which highlight the areas
in the building where these low-energy materials have been used. Compliance 17.2.3 requires
submission of the bill of quantities, which demonstrate that the products specified in compliance
17.2.1 are purchased by the project. Compliance 17.2.4 requires a narrative along with photographs.
Compliance 17.2.5 requires a signed certificate of compliance with the criterion from the architect.
Guide to use GRIHA online evaluation tool
Select criterion 17 on the homepage of GRIHA. Check the goals that are to be attempted.
Once the goals are selected, the required compliance documents will be checked. Compliance
17.2.1 requires cut sheets, specifications sheets, and brochures of the materials/finishes used in the
building. Compliance 17.2.2 requires submission of AutoCAD drawings, which highlight the areas
in the building where these low-energy materials have been used. Compliance 17.2.3 requires
submission of the bill of quantities, which demonstrate that the products specified in compliance
17.2.1 are purchased by the project. Compliance 17.2.4 requires a narrative along with photographs.
Compliance 17.2.5 requires a signed certificate of compliance with the criterion from the architect.