Page 6 - GRIHA Manual Volume V - Introduction to National Rating System
P. 6
Contents
IntroductIon ..........................................................................................................................................1
EvaluatIon ProcEdurE for GrIHa documEntatIon
Criterion 1: Site SeleCtion ....................................................................................................................................................3
Criterion 2: PreServe and ProteCt landSCaPe during ConStruCtion .................................................7
Criterion 3: Soil ConServation (till PoSt-ConStruCtion) ...........................................................................15
Criterion 4: deSign to inClude exiSting Site featureS ....................................................................................19
Criterion 5: reduCe hard Paving on-Site and/or Provide Shaded
hard-Paved SurfaCeS ..........................................................................................................................................................23
Criterion 6: enhanCe outdoor – lighting SyStem effiCienCy and uSe
renewable energy SyStem for meeting outdoor lighting requirementS .................................29
Criterion 7: Plan utilitieS effiCiently and oPtimize on-Site CirCulation
effiCienCy ....................................................................................................................................................................................33
Criterion 8: Provide minimum level of Sanitation/Safety faCilitieS for
ConStruCtion workerS ...................................................................................................................................................37
Criterion 9: reduCe air Pollution during ConStruCtion ...........................................................................43
Criterion 10: reduCe landSCaPe water requirement ......................................................................................47
Criterion 11: reduCe water uSe in the building ..................................................................................................51
Criterion 12: effiCient uSe of water during ConStruCtion.......................................................................53
Criterion 13: oPtimize building deSign to reduCe Conventional energy demand ..................55
Criterion 14: oPtimize energy PerformanCe of building within SPeCified
Comfort limitS........................................................................................................................................................................63
Criterion 15: utilization of fly aSh in building StruCture .......................................................................69
Criterion 16: reduCe embodied energy of ConStruCtion by adoPting effiCient
teChnologieS and/or low-energy materialS ..................................................................................................73
Criterion 17: uSe low-energy material in interiorS .......................................................................................77
Criterion 18: renewable enery utilization .............................................................................................................81
Criterion 19: renewable-energy baSed hot water SyStem .........................................................................85
Criterion 20: waSte-water treatment .......................................................................................................................87
Criterion 21: water reCyCle and reuSe (inCluding rainwater) ................................................................91
Criterion 22: reduCtion in waSte during ConStruCtion .............................................................................95
IntroductIon ..........................................................................................................................................1
EvaluatIon ProcEdurE for GrIHa documEntatIon
Criterion 1: Site SeleCtion ....................................................................................................................................................3
Criterion 2: PreServe and ProteCt landSCaPe during ConStruCtion .................................................7
Criterion 3: Soil ConServation (till PoSt-ConStruCtion) ...........................................................................15
Criterion 4: deSign to inClude exiSting Site featureS ....................................................................................19
Criterion 5: reduCe hard Paving on-Site and/or Provide Shaded
hard-Paved SurfaCeS ..........................................................................................................................................................23
Criterion 6: enhanCe outdoor – lighting SyStem effiCienCy and uSe
renewable energy SyStem for meeting outdoor lighting requirementS .................................29
Criterion 7: Plan utilitieS effiCiently and oPtimize on-Site CirCulation
effiCienCy ....................................................................................................................................................................................33
Criterion 8: Provide minimum level of Sanitation/Safety faCilitieS for
ConStruCtion workerS ...................................................................................................................................................37
Criterion 9: reduCe air Pollution during ConStruCtion ...........................................................................43
Criterion 10: reduCe landSCaPe water requirement ......................................................................................47
Criterion 11: reduCe water uSe in the building ..................................................................................................51
Criterion 12: effiCient uSe of water during ConStruCtion.......................................................................53
Criterion 13: oPtimize building deSign to reduCe Conventional energy demand ..................55
Criterion 14: oPtimize energy PerformanCe of building within SPeCified
Comfort limitS........................................................................................................................................................................63
Criterion 15: utilization of fly aSh in building StruCture .......................................................................69
Criterion 16: reduCe embodied energy of ConStruCtion by adoPting effiCient
teChnologieS and/or low-energy materialS ..................................................................................................73
Criterion 17: uSe low-energy material in interiorS .......................................................................................77
Criterion 18: renewable enery utilization .............................................................................................................81
Criterion 19: renewable-energy baSed hot water SyStem .........................................................................85
Criterion 20: waSte-water treatment .......................................................................................................................87
Criterion 21: water reCyCle and reuSe (inCluding rainwater) ................................................................91
Criterion 22: reduCtion in waSte during ConStruCtion .............................................................................95