Page 39 - GRIHA Manual Volume II - Introduction to National Rating System
P. 39
Sustainable site planning 31


































Figure 16 The existing tree cover (as seen in the top picture dated 12 February 2007) was carefully maintained
during the construction of the Hindustan Unilever head ofice building in Andheri East (Mumbai). Trees were largely
transplanted or preserved so the site retained its green cover (as seen in the lower picture dated 12 October 2009),
which also helped retain the fauna that was dependant on the site vegetation.
Source Google Earth (Picture dated 12 October 2009)














2.2.8 Landscape plan, if applicable, clearly highlighting the tree-removed areas (indicating the
number of trees) with the number of replanted trees in the ratio of 1:3 in the proposed
landscape designs. A list with details about the species that existed and the species that
have been replanted on site.
2.2.9 Landscape plan showing plantation in excess of 25% compared to minimum requirement.
   34   35   36   37   38   39   40   41   42   43   44