Page 40 - GRIHA Manual Volume II - Introduction to National Rating System
P. 40
32 GrIha Manual: Volume 2







































Figure 17 At the Hindustan Unilever site, shore piling was done for preserving the existing trees, which were within
6 metres from the excavation line. After excavating up to a depth of 10 metres, the trees at the edge of the excavation
were still intact due to the shore piling.



































Figure 18 Site plan showing trees that were cut, protected, and compensatory plantation areas.
   35   36   37   38   39   40   41   42   43   44   45