Evaluation procedure 111



with the recommendations of the moef, government of india.
2. a list of all the hvaC/refrigeration equipment and systems along with the number of items
purchased and the type of refrigerant used in each case. manufacturer brochures to be
attached.

Review checklist
1. Check whether the refrigerants mentioned comply with the moef recommendations.
2. Check to ensure that all hvaC and refrigeration equipments are mentioned along with the
respective refrigerants used in each case.
3. Purchase proof to be mentioned in the documents.

Possible errors

1. Some of the equipments used in the building might not be mentioned.
2. the purchase order of the equipment might not be attached along with the certificate.
3. the refrigerant used for each equipment might not be specified.

Appraisal 27.3.3
the fire suppression systems and fire extinguishers installed in the building are free of halon, as per
clause 27.2.5.

Required documentation
1. Certificate from the fire fighting consultant/manufacturer demonstrating that the fire
suppression systems do not contain any halon. also, the substitute of halon being used in
the fire suppression systems should be mentioned.

Review checklist
1. Check that the certificate from the fire fighting consultant is duly signed and descriptive
regarding the fire fighting systems used.
2. Check that the certificate is duly signed.
3. Check that the substitute of halon used is mentioned in the certificate.

Possible errors
1. the certificate might not have the signature of the fire fighting consultant.
2. the halon-substitute might not be in compliance with the moef recommendations.
3. the manufacturer brochure might not be attached.
Point allocation

one mandatory point should be awarded to the project in case all the above appraisals are
complied with.