Page 126 - GRIHA Manual Volume II - Introduction to National Rating System
P. 126
118 Griha Manual: Volume 2



































Figure 2 A 3-metre-high brick wall constructed along the site periphery for site barricading


In order to control loose particles from becoming air-borne, materials like sand, cement etc.,
should be covered with some kind of fabric as shown in figure 3.


































Figure 3 Construction materials covered with fabric to prevent loose particles from becoming airborne
   121   122   123   124   125   126   127   128   129   130   131