In this particular criterion, both goals are mandatory. Therefore, both the goals have to be checked
and all four compliances have to be attempted.
Compliance 8.2.1 is a signed letter from the project manager of the project. Compliance 8.2.2
refers to a document with relevant sections of the tender documents attached.
The document required for Compliance 8.2.3, involves showing the actual site photographs of
the various measures taken to comply with the criterion along with a short description for each.
The document for Compliance 8.2.4 requires a narrative on the safe drinking water and sanitation
facilities provided for the workers.