Page 130 - GRIHA Manual Volume V - Introduction to National Rating System
P. 130
Evaluation procedure 123





























































Figure 9 Sample of company policy document for ban/prohibition of smoking within the building premises

Appraisal 30.3.2

a signed template by hvaC/ architectural consultant certifying that all compliances are met, as per
clauses 30.2.2– 30.2.5 (mandatory 1 point).

Required documentation
1) the building plan/interior layout signed by the architect, demonstrating the internal
planning for the smoke control by locating the designated smoking zone on the
building periphery separated from the non-smoking areas by full height impermeable
internal partitions.
2) for a conditioned space, clearly demonstrate with the help of the aC system design
documents, signed by the hvaC consultant or the site engineer, that