33.1.5 Prepare a fully-documented o&m manual/ Cd/ multimedia/ an information brochure
listing the best practices/dos and don’ts/maintenance requirements for the building’s
systems along with the name and address of the manufacturer/supplier of the respective
systems. this should be carried out by the owner/builder/occupants/service or facility
management group.

33.2 Compliance

33.2.1 Submit drawings and documents showing locations of energy and water meters.
33.2.2 applicant shall provide the provision proof for a core facility/service group responsible
for the o&m of the building’s systems after installation. this should be supported with
the contract (mutually signed between the respective parties) document or supportive
documents, verified, and signed by the responsible parties.
33.2.3 applicant shall provide inclusion proof of a specific clause in the contract document of
the systems supplier for commissioning (installation and test run) of all electrical and
mechanical systems.
33.2.4 applicant shall provide inclusion proof of a specific clause in the contract document of
the systems supplier for providing training to the core facility/ service group responsible
for the o&m of the building systems after installation, on the operating instructions/dos
and don’ts/ maintenance requirements for the specific system.
33.2.5 Submit a copy of the fully documented o&m manual/ Cd/ multimedia / information
brochure enlisting the best practices for o&m of the building’s systems. the name
and address of the manufacturer/supplier of the respective system, owner/builder to
be given to the occupants or to the service/facility management group at the time of
occupation.
33.3 Appraisal (2 Points Mandatory)

33.3.1 Provision of meters for monitoring building’s energy and water consumption, as per
clause 33.2.1 (mandatory 1 point).
33.3.2 Provision for a core facility/service group responsible for the o&m of the building’s
systems after installation as per clause 33.2.2. inclusion of a specific clause in the contract
document of the systems supplier for commissioning (installation and test run) of all
electrical and mechanical systems as per clause 33.2.3. inclusion of a specific clause in
the contract document of the systems supplier for providing training to the core facility/
service group responsible for the o&m of the building systems after installation, on
the operating instructions/dos and don’ts/ maintenance requirements for the specific
system, as per clause 33.2.4. development of a fully documented o&m manual/ Cd/
multimedia / information brochure enlisting the best practices for o&m of the building’s
systems, as per clause 33.2.5 (mandatory 1 point).


Evaluation procedure


Appraisal 33.3.1

Provision of meters for monitoring building’s energy and water consumption, as per clause 33.2.1
(mandatory 1 point).